SNC-Lavalin continues to make progress on construction of the PSEG Keys Energy Center LLC.
Site Looking Northwest with Tank Roofs Installed:
HRSG12 – 6 of 10 Modules set with ACC in background:
GSU-11 Offload:
ACC Fan and Bridge Set:
Aux Boiler and Stack Base Set:
Rebar tying/form setting of Turbine Building Floor Slab: