PSEG Keys Energy Center LLC Construction Progress Pictures (7/25/16)

SNC-Lavalin continues to make progress at the PSEG Keys Energy Center LLC.

Switchyard Installed Piers Keys Site 7-14-2016 015

Switchyard Installed Piers Keys Site.

Ware House Structure Looking S Keys Site 7-4-2016 005

Ware House Structure Looking S Keys Site.

Warehouse Big Top Errection Keys Site 6-8-2016 019

Warehouse Big Top Errection Keys Site.

Warehouse Big Top Keys Site 7-14-2016 008

Warehouse Big Top Keys Site.

Switch Yard Pier Installation Keys Site 7-14-2016 016

Switch Yard Pier Installation Keys Site.

Ware House Structure Looking S Keys Site 7-4-2016 005

Ware House Structure Looking S Keys Site.

Warehouse Big Top Errection Keys Site 6-8-2016 019

Warehouse Big Top Errection Keys Site.

CT 11 WWD Tank Excavation Keys Site 6-3-2016 002

CT 11 WWD Tank Excavation Keys Site.

first UG pipe installed 10OWS543 looking east

UG pipe installed 10OWS543 looking east.

PEPCO Right of Way Restored Keys Site 7-4-2016 006

PEPCO Right of Way Restored Keys Site.

PMO Keys Site 6-3-2016 003

PMO Keys Site.

Click here for more progress pictures.