In an effort to minimize mud tracks and dirt trails from construction traffic, SNC-Lavalin has added a wash out station to the PSEG Keys Energy Center LLC.
Effective immediately, SNC-Lavalin requires all construction traffic to go through the wash out station before exiting the project site during inclement weather conditions.
The wash out area is a best practice of SNC-Lavalin designed to prevent debris and mud from leaving the project site during wet weather.
SNC-Lavalin has also hired a local vendor to sweep the street free of dirt and debris as an added safe guard.