SNC-Lavalin continues to make progress at the PSEG Keys Energy Center LLC. 

FGS Piping Trench Keys Site 3-19-16 007

FGS Piping Trench Keys Site

Lime Soil Grinding at Switch Yard Keys Site 3-24-2016 010

Lime Soil Grinding at Switch Yard Keys Site

U.G FGS Pipe Install Keys Site 3-15-2016 004

U.G FGS Pipe Install Keys Site

Proof Rool at Switch Yard Keys Site 3-19-16 005

Proof Rool at Switch Yard Keys Site

Duct Bank From MH 005 to Sectionalizers Keys Site 3-22-2016 001

Duct Bank From MH 005 to Sectionalizers Keys Site

 

Substation Drains Keys Site 3-9-2016 010Substation Drains Keys Site